Equipartition scheme in RFQ

https://www.dacm-logiciels.fr/rfqdesigner
Post Reply
Indiasarvesh
Initiated
Initiated
Posts: 44
Joined: Wed 30 Mar 2022 16:12
Location: IUAC Delhi and CERN Geneva
Country:
India (in)
India

Equipartition scheme in RFQ

Post by Indiasarvesh »

Dear URIOT

Can you provide definition of mismatch factor Mx, My and Mz. Can they be correlated to judge equipartition scheme in RFQ? Otherwise how to force equipartition scheme for RFQ in TRACEWIN?

Thanks
Sarvesh
User avatar
FranceDidier
Administrator
Administrator
Posts: 852
Joined: Wed 26 Aug 2020 14:40
Country:
France (fr)
France

Re: Equipartition scheme in RFQ

Post by FranceDidier »

Dear Sarvesh,

The mismatch factor is defined in the manual and regarding your second point, could you give me more details?

Regards,

Didier
Indiasarvesh
Initiated
Initiated
Posts: 44
Joined: Wed 30 Mar 2022 16:12
Location: IUAC Delhi and CERN Geneva
Country:
India (in)
India

Re: Equipartition scheme in RFQ

Post by Indiasarvesh »

Beam mismatch: (mx, my, mz) The input beam is mismatched by a percentage. A 20 % mismatch in x
plane means αx and βx are multiplied by 1.2². What is meaning of 40% mismatch? 2*1.2²?. What is logic of this formula of 1.2²?

Secondly, Equipartition means ratio of emitance multiplies phase advances in longitudinal and transverse phase space should be equal to one specially after the gentle buncher section in RFQ?.

El*SigmaL/Et*Sigmat = 1. How to implement this condition? Similarly is the ratio of longitudinal beam radius and transverse beam radius =1 for equipartition scheme.
User avatar
FranceDidier
Administrator
Administrator
Posts: 852
Joined: Wed 26 Aug 2020 14:40
Country:
France (fr)
France

Re: Equipartition scheme in RFQ

Post by FranceDidier »

Dear Sarvesh,

Ok, I thougth you spoke about mismatch factor (comprasion between 2 elippses) (see "Mismatch factor" chapter in manual).
For input beam:
20% -> βx are multiplied by 1.2² means that transverse size is 20% bigger
40% -> βx are multiplied by 1.4² means that transverse size is 40% bigger

For your second point, it's a question of how to design an RFQ to have this requirement, isn't it?

Regards,

Didier
Indiasarvesh
Initiated
Initiated
Posts: 44
Joined: Wed 30 Mar 2022 16:12
Location: IUAC Delhi and CERN Geneva
Country:
India (in)
India

Re: Equipartition scheme in RFQ

Post by Indiasarvesh »

Yes, and the one of the best way to design is to have equipartition scheme. Does the RFQDesign follow this or any other way?
User avatar
FranceDidier
Administrator
Administrator
Posts: 852
Joined: Wed 26 Aug 2020 14:40
Country:
France (fr)
France

Re: Equipartition scheme in RFQ

Post by FranceDidier »

Dear Sarvesh,

I have moved your topic to RFQ_designer because I think it is mainly about this thematic.

Regards,

Didier
Indiasarvesh
Initiated
Initiated
Posts: 44
Joined: Wed 30 Mar 2022 16:12
Location: IUAC Delhi and CERN Geneva
Country:
India (in)
India

Re: Equipartition scheme in RFQ

Post by Indiasarvesh »

Please see the attached figure. If mismatch factor is 1% -> βx are multiplied by 1.01² means that transverse size is 1% bigger, Please suggest me if its correct or not ?
Attachments
Mismatch.jpg
Mismatch.jpg (137.75 KiB) Viewed 36138 times
FranceRomualdDuperrier
Global moderators
Global moderators
Posts: 74
Joined: Fri 28 Aug 2020 14:59
Location: Paris-Saclay
Country:
France (fr)
France

Re: Equipartition scheme in RFQ

Post by FranceRomualdDuperrier »

Hi

It seems your question relates to TraceWin use. Please post it in the dedicated forum and Didier Uriot will do his best for supporting you in using TraceWin.

Best,

Romuald
Post Reply